Project Details
S&B provided engineering for a wastewater collection system that would include ~36,000 linear feet of 16” force main and a lift station capable of pumping 1.25 MGD of sewer flows to a nearby treatment plant.
We also provided surveying services to acquire 6.8 miles of right-of-way to install the new force main, providing the final digital terrain model to assist the project engineers in developing the plan and profile. S&B prepared the final deliverables including the ASCII point file, AutoCAD Civil 3D file and MicroStation 2D/3D DGN file with a TIN and DAT file.
