An eighteen-wheeler hauling equipment to the Meeker 2 Cryogenic Gas Processing Plant

Meeker 2 Cryogenic Gas Processing Plant

  • Client: Enterprise Products
  • Location: Meeker, Colorado
  • Market: Midstream
  • Submarket: Gas Processing
  • Services:
    • Integrated EPC

Project Details

S&B performed EPC for a 750-MMSCFD grassroots cryogenic gas processing facility, including inlet separation and filtration, condensate stabilizer, gas dehydration, hot oil system, two 24,000-HP electric residue gas compressors, refrigeration compressor, 6,700-HP turbo-expander, NGL stabilizer, amine treating, power distribution substation, thermal oxidizer, water treatment package and utilities.

Transport of super-heavy equipment and modules from Canada was accommodated. S&B took over the project from another contractor late in the detailed design phase. Despite this, the project was delivered with the highest quality, on time and on budget.

Our Midstream expertise in action.

S&B delivers turnkey EPC projects of all sizes, types and complexities to midstream operators. Find out what makes us the industry leader in this segment.