Project Details
S&B performed EPC for a 650-MMSCFD grassroots cryogenic gas processing facility, including inlet separation and filtration, condensate stabilizer, high-pressure dehydration, hot oil system, two 20,000-HP electric residue gas compressors, refrigeration compressor, 5,500-HP turbo-expander, NGL stabilizer, amine treating, power distribution substation, thermal oxidizer, water treatment package and utilities.
Transport of super-heavy equipment and modules from Louisiana was accommodated. S&B took over the project from another contractor late in the detailed design phase. Despite this, the project was delivered with the highest quality, on time and on budget.