Engineering resources remain in high demand. Deloitte’s research on the engineering and construction workforce found that more than 80% of executives surveyed reported difficulty filling open positions. For mills, the challenge is not simply finding people. It is having the right engineering resources available when the workload requires them.
Mill engineering teams support operating assets, respond to immediate needs and keep project work moving. But demand can change quickly. A mill may have a steady workload one month and then be supporting a recovery boiler upgrade, paper machine improvement, or other capital initiatives the next, all while maintaining day-to-day operations. Maintaining every engineering discipline internally to cover those peaks is not always practical.
A long-term engineering alliance provides another approach. Instead of engaging an engineering firm only when a project reaches execution, the mill establishes an ongoing relationship with a partner that works as an extension of the owner’s engineering organization, providing additional capacity and specialized expertise when needed. Because that partner works alongside the mill team over time, it learns each site’s people, facility, processes and procedures rather than starting from scratch with every project.
Why flexible engineering capacity matters
When engineering resources can adjust with the workload, mills are better positioned to:
-
Keep projects moving when internal resources are stretched
-
Access specialized disciplines without adding permanent staff
-
Respond to changing project priorities and schedules
-
Support multiple capital projects at the same time
-
Give mill personnel more time to focus on operations and owner responsibilities
-
Match engineering resources more closely to actual project demand
The goal is not simply to add people. It is to have the right capabilities available when and where they are needed.
Build around the mill team
A successful alliance starts with the mill’s existing team. The engineering partner needs to understand which responsibilities mill personnel want to lead, where additional capacity is needed and when specialized resources can support the work.
Support may include project engineering across multiple assignments, along with process, mechanical, piping, electrical, instrumentation and controls and civil or structural engineering support. Depending on the project, mills may also need estimating, scheduling, procurement, project management or specialized expertise tied to production, utilities or environmental systems. Rather than maintaining all those capabilities internally, the mill can access them as needed.
The owner and engineering partner also establish how work will be assigned, how responsibilities will be divided and how projects will be managed. With a working structure already in place, the mill does not need to create a new approach every time it needs additional engineering support.
Over time, the alliance team becomes familiar with each site’s people, facility, processes and procedures. That familiarity is what separates an alliance from a transactional relationship. Instead of starting every assignment by learning how the mill operates, the team already knows the site, who to involve and which standards apply, so it can function much more independently and needs less direction from mill personnel.
Scale with the workload
Engineering demand rarely stays at one level. A mill may have a steady stream of smaller projects and then reach a period when several larger assignments need support at once. A project may also require specialized expertise that the mill does not need on a full-time basis.
An alliance lets the mill adjust engineering support to meet changing demand. A focused team can handle routine project needs, while additional people or specialized disciplines can be added as projects grow and scaled back when demand decreases.
The same model can support multiple projects across a mill’s capital program. Instead of staffing each assignment independently, teams can coordinate resources across projects and adjust as priorities and schedules change.
Give mill personnel room to focus
Additional engineering capacity can also give mill personnel more time to focus on the work that requires their direct involvement. Operations, maintenance priorities, owner decisions and day-to-day facility needs do not stop when capital project workloads increase. Bringing in the right resources at the right time helps keep project work moving without requiring the mill to permanently staff for its peak demand.
Making the alliance model work
Flexible resources are most effective when the mill and engineering partner have a clear structure for working together. A few practical steps can help:
- Define responsibilities early – Establish which activities the mill will lead and where the engineering partner will provide support.
- Plan for changing workloads – Look beyond individual projects to upcoming capital and maintenance needs so resources can be adjusted as priorities change.
- Identify specialty needs early – Determine where process, mechanical, electrical, controls or other specialized expertise may be needed before those needs affect the schedule.
- Establish clear ways of working – Agree on communication, project controls, deliverables and decision-making, so additional resources can integrate efficiently with the mill team
A well-structured alliance allows resources to expand, contract and shift across projects without rebuilding the working relationship for every assignment.
A flexible extension of the mill team
The value of an alliance is a structure that lets the mill match engineering resources to the work, whether that means a small team supporting routine projects or a multidisciplinary team responding to a larger capital need.
The most effective alliance relationships shape how mills execute work over time. Rather than engaging outside resources for a single project, mills gain access to engineering support that scales with demand, provides specialized expertise and strengthens internal capabilities as workloads and project priorities change.
S&B’s pulp and paper team has supported mills across North America for decades. Many in the industry first knew our organization through Ford, Bacon & Davis, a name with a long history of supporting pulp and paper facilities. Today, that experience continues under S&B, helping mills execute projects, supplement internal resources and address evolving operational needs.
Whether supporting a long-term capital program, ongoing mill engineering needs or a specific project, an engineering alliance provides a flexible way for pulp and paper facilities to access the resources and technical expertise required to keep work moving.