International Power on Behalf of Alstom Power - Midlothian, TX Project
This project, which was the 2001 Associated Builders and Contractors (ABC) "Award Of Merit" winner, involved installation of two single shaft KA24-1 (GT-24) combustion turbine/generators, two triple pressure HP steam turbines, and an IP/LP steam turbine generator with associated auxiliaries. The project also required:
- Fuel gas system with compression and preheat
- De-mineralized water, feed water, and condensate systems
- SCR ammonia storage and delivery system
- Main and auxiliary transformers and breakers
- 45,000 feet of system piping
- Commissioning